Industrial MEP

MEP for factories. Built for production, costed for energy.

Factory MEP is a different optimisation problem from commercial MEP. The customer is production, not occupants. Energy is the largest line item after raw materials. Downtime costs measured in lost shipments, not lost rent. Here's how we approach industrial and RMG (garment) factory MEP across Sri Lanka, Bangladesh, and the Maldives.

What makes this vertical different

How we approach it

Our scope of work

Power
MV/LV distribution, transformers, switchgear, generators (prime + standby), capacitor banks for PFC, sub-metering for production-line cost allocation
HVAC and process cooling
Industrial chillers, AHUs sized for process loads, evaporative cooling, exhaust ventilation, dust extraction, factory dehumidification
Fire safety
Industrial sprinklers, foam suppression for fuel risks, dust-rated detection in textile/wood, ESFR storage racks
Compressed air
Compressors, dryers, ring-main distribution, point-of-use regulators
Specialised
Wastewater pre-treatment, condensate recovery, heat recovery from process equipment, solar PV integration where feasible

Related projects & insights

Discuss your factory MEP project

Send us your brief, drawings, or even a one-line description of what you're building. We'll get back within one business day with a starting position — no obligation, no sales call unless you ask for one.

Get in touch →